South East based · UK-wide projects
Commercial EV charger installation in Sussex, Surrey & Kent
Chargers for car parks, workplaces and fleet depots, installed by one contractor from the first trench to the final certificate. We're part of McCance Group, the civil engineering contractor, so the groundworks and the electrics come under one contract.
Who it's for
Charging for any site with parking
Workplaces & offices
Staff and visitor charging, with access control and usage reports.
Public & council car parks
Pay-to-charge bays with card or app payment, built to suit public use.
Fleet & van depots
Overnight and rapid charging sized around your vehicles and shift patterns.
Retail & hospitality
Chargers that bring customers in and keep them on site longer.
Residential blocks
Shared charging for flats and managed developments, with billing per resident.
Farms & rural businesses
Long cable runs, outbuildings and tricky supplies are part of our everyday work.
Charger types
The right charger for how long cars stay
The best charger depends on dwell time. A car parked all day at work needs a different charger from a delivery van that's back on the road in an hour.
| Charger | Typical output | Best for | Supply |
|---|---|---|---|
| AC single-phase | 7 kW | All-day workplace parking, residential blocks | Single-phase |
| AC three-phase | 11–22 kW | Visitor bays, hotels, retail, overnight fleet | Three-phase |
| DC rapid | 50 kW + | Fleet turnaround, public car parks, short stays | Three-phase, often an upgraded supply |
Most sites use a mix. Load management shares the available supply between chargers, which often avoids a costly supply upgrade.
How it works
Survey to switch-on, one contract
On most commercial EV jobs, the electrician has to bring in a separate groundworks contractor. That means two programmes, two sets of overheads and a gap where problems fall through. We do both.
Our civil engineering team works on car parks and highway structures every week. Trenching through a live car park, reinstating surfacing and keeping traffic moving is normal work for us.
- Site survey & load assessmentWe check your supply capacity, parking layout and the best charger positions.Electrical
- Design & fixed quoteCharger numbers, cable routes and load management, with a fixed price.Electrical + civils
- DNO applicationIf you need more capacity, we apply to the network operator for you.Electrical
- GroundworksTrenching, ducting, charger bases and draw pits, with traffic management where needed.Civils
- InstallationCabling, distribution, chargers and the back-office platform for access and billing.Electrical
- ReinstatementTarmac, surfacing and bay markings put back to finish.Civils
- Testing & handoverTested, certified and commissioned, with your team shown how it all works. Progress and photos are reported live throughout the job.Electrical
Standards
Installed and certified properly
Wiring regulations
The part of the 18th Edition that covers EV charging installations specifically, including earthing and protection.
EV charging equipment
Industry guidance on design, location and installation of charge points, which we follow on every job.
Registered contractor
Our electrical work is regularly assessed. NAPIT member no. 70647
Pre-qualified
Held by McCance Construction Ltd, so we're ready for council and corporate supplier checks.
Our work
Commercial EV charging jobs



FAQs
Common questions
Do you handle the groundworks as well as the chargers?
Yes. We're part of McCance Group, a civil engineering contractor, so trenching, ducting, charger bases and resurfacing are done by our own team under the same contract as the electrical installation.
Will my site need a supply upgrade?
It depends on your existing capacity and how many chargers you want. Our survey includes a load assessment. Load management can often avoid an upgrade, and where one is needed we handle the application to the network operator.
Can we charge drivers to use the chargers?
Yes. We fit networked chargers that connect to a back-office platform, so you can set tariffs, take payment and control who has access.
Is grant funding available?
Government funding schemes change regularly. We check what your site currently qualifies for as part of the survey and include it in the quote where it applies.
Can you work while our car park stays open?
Yes. We phase the work and use traffic management so most of your bays stay usable, as we do on live car park and highway jobs.
Which areas do you cover?
We're based in East Grinstead and take on commercial EV projects anywhere in the UK. Our civils team already works on car parks and highway structures nationwide.
Book a survey
Tell us about your site
Give us a rough idea of the site and how many vehicles need charging. We'll arrange a survey and come back with a fixed quote covering the civils and the electrics.
Call: 020 8054 1941 · Mobile 07590 120 104
Accreditations
NAPIT registered · no. 70647
Constructionline Gold
SSIP accredited
Social Value
Constructionline Gold and SSIP are held by McCance Construction Ltd, part of McCance Group.

